I call this the sweetheart


Off grid full time = big toys

Final wiring in progress.

This is a big system. 8 “Powerwing” battery modules (18kw). 3kw of 310w Silfab panels. 4048 Schneider SW inverter/charger. 600/85 solar controller. I mean top of the line, deluxe; all housed in a fabulous outbuilding.

See under “Solar Systems / Full time off grid” for more information on how to purchase or build a similar system.

Wiring harness parallels cells

First wiring: harnesses are in. BMS to come.

The purpose is to load shave the grid and charge an electric Leaf automobile. How cool is that?

 


Leave a Reply